Make Sure Your Sprinklers Are Ready for Spring

We will begin to power up the pressure irrigation system on April 1. Before that happens, all PI customers should:

Turn off your stop and waste valve to avoid flooding.  Disconnect hoses.  Check for and repair cracks in standpipes.

It takes 10-14 days to fill the entire system, so water should be available to all PI customers by April 15, although some may receive it earlier.  Even if everything was working perfectly in the fall, it’s possible that cold weather has damaged parts of your system.In general, everything past the stop and waste is the responsibility of the property owner, not of WaterPro. If you need to repair your system or need help checking it out, please contact a qualified landscaper or sprinkler system expert.