Are You Ready for Pressure Irrigation?

On April 1, we start pressuring up our pressure irrigation system. Be sure to turn off your stop and waste valve, disconnect hoses, and check your system for cracks and leaks to avoid flooding once the system is pressured up (approx. 10-14 days).