Pressure Irrigation Season Checklist for March:

  • Stop and waste-OFF;
  • Leaks-REPAIRED;

On March 29 we start putting water in our Pressure Irrigation (PI) system to get ready for the official start of the irrigation season on April 15.

Make sure your stop and waste valve is in the “off” position before March 29 to avoid flooding your yard, house, or neighborhood! This is also a great time to fix any leaks or breaks that may have happened over the winter.

Please contact a qualified landscaper if you need help. WaterPro’s responsibility for the water system ends at your meter if you have one; if no meter, at the stop and waste. Any leaks or damage on a customer’s property are the responsibility of the property owner