Archive for Construction – Page 2

Pressure Irrigation System Shuts Down on October 15

WaterPro’s pressure irrigation system will shut down for the season on October15. This date is determined by the water rights we hold.
Whether you are connected to the pressure irrigation system or use culinary water to water your lawn and landscaping, be sure to take the following steps to protect your system for the winter:
– Leave ball valves open.
– Turn off your stop and waste valve so that water will drain out of the lines.
If your system is not properly winterized, there may be water left in the lines which will freeze during the winter and may damage your system. Then when you start up the system in the spring, it may flood and cause damage to your property.
Please note that WaterPro maintains only the public portion of the pressure irrigation and culinary systems. Our responsibility for water lines ends at the stop and waste valve for a pressure irrigation system, and at the meter for a culinary system. We are unable to provide assistance to our customers in maintaining their individual systems.
If you need help in winterizing your system, please contact a qualified landscaper.

Culinary Development Costs

For those looking to develop property within WaterPro Inc’s culinary service area, the following information portraits the company’s administrative, engineering review, and impact fees for the culinary system only.

General Connection Fee
3/4″ Meter 1″ Meter
$ 3,326.00 $   5,227.00
Little Valley Connection Fee
3/4″ Meter 1″ Meter
$ 8,126.00 $ 10,027.00

Connections larger than 3/4″ or 1″, or multi-unit connections, please contact our office for impact fee calculations.

Subdivision Fees
Engineering/Administration Fees Fee
General Admin/Process $ 700.00
General Engineering (click for detail) $ 580.00
Engineering Plan Review (click for detail) $ 650.00 plus $0.50/ft over 500ft
Large Meter (>1″) Impact Fee Determination $ 180.00
Legal Fees $ 100.00 minimum + actual costs
Mainline Inspection $ 200.00 plus $0.35/ft over 100ft
Mainline Tap or Cut In Inspection $ 650.00
Water Service Line Inspection $ 50.00
1.5″ or 2″ Service Line Inspection $ 100.00
Large Vault Inspection $ 500.00
Extension Agreements/Spec Books (Each) $ 15.00

 

Single Lot Fees (services only)
Engineering/Administration Fees Fee
General Admin/Process $ 300.00
Large Meter (>1″) Impact Fee Determination $ 180.00
Legal Fees $ 100.00 minimum + actual costs
Water Service Line Inspection (3/4″ or 1″) $ 150.00
1.5″ or 2″ Service Line Inspection $ 250.00
Extension Agreements/Spec Books (Each) $ 15.00